<?xml version="1.0"?><Regulation lims:pit-date="2025-02-28" lims:lastAmendedDate="2025-02-28" lims:current-date="2025-03-03" lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513451" lims:id="1513451" gazette-part="II" regulation-type="SOR" xml:lang="en" xmlns:lims="http://justice.gc.ca/lims"><Identification lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513452" lims:id="1513452"><InstrumentNumber>SOR/2025-60</InstrumentNumber><RegistrationDate><Date><YYYY>2025</YYYY><MM>2</MM><DD>28</DD></Date></RegistrationDate><ConsolidationDate><Date><YYYY>2025</YYYY><MM>3</MM><DD>4</DD></Date></ConsolidationDate><EnablingAuthority lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513453" lims:id="1513453"><XRefExternal reference-type="act" link="I-2.75">IMPACT ASSESSMENT ACT</XRefExternal></EnablingAuthority><LongTitle lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513454" lims:id="1513454">Order Designating Certain Excluded Classes of Projects</LongTitle></Identification><Order lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513455" lims:id="1513455"><Provision lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513456" lims:id="1513456" format-ref="indent-0-0" language-align="yes" list-item="no"><Text>Whereas the Minister of the Environment is of the opinion that the carrying out of a project under one of the designated classes of projects under the annexed Order will cause only insignificant adverse environmental effects;</Text></Provision><Provision lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513457" lims:id="1513457" format-ref="indent-0-0" language-align="yes" list-item="no"><Text>And whereas, under subsection 89(2) of the <XRefExternal reference-type="act" link="I-2.75">Impact Assessment Act</XRefExternal><FootnoteRef idref="fn_81000-2-5248_hq_1700151884">a</FootnoteRef>, that Minister has considered the comments received from the public in deciding whether to make the designation;</Text><Footnote id="fn_81000-2-5248_hq_1700151884" placement="page" status="official"><Label>a</Label><Text>S.C. 2019, c. 28, s. 1</Text></Footnote></Provision><Provision lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513458" lims:id="1513458" format-ref="indent-0-0" language-align="yes" list-item="no"><Text>Therefore, the Minister of the Environment makes the annexed <XRefExternal reference-type="regulation" link="SOR-2025-60">Order Designating Certain Excluded Classes of Projects</XRefExternal> under subsection 88(1) of the <XRefExternal reference-type="act" link="I-2.75">Impact Assessment Act</XRefExternal><FootnoteRef idref="fn_81000-2-5248_hq_1700151884">a</FootnoteRef>.</Text></Provision><Provision lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513459" lims:id="1513459" format-ref="indent-0-0" language-align="yes" list-item="no" topmarginspacing="20"><Text>Ottawa, February 27, 2025</Text><TableGroup lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513460" lims:id="1513460" bilingual="yes" orientation="portrait" pointsize="11pt" rowbreak="no" spanlanguages="no" spanmarginalnotecol="no" topmarginspacing="50pt"><table lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513461" lims:id="1513461" frame="none"><tgroup lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513462" lims:id="1513462" cols="2"><colspec colname="1" colwidth="100*" /><colspec colname="COLSPEC0" colwidth="100.00*" /><tbody lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513463" lims:id="1513463"><row rowsep="0"><entry colsep="0" nameend="COLSPEC0" namest="1" rowsep="0" valign="top"><SignatureBlock justification="center" width="20pc"><SignatureTitle justification="center"><Language xml:lang="fr">Le ministre de l’Environnement,</Language></SignatureTitle><SignatureLine justification="center" topmarginspacing="30"><Leader leader="solid" length="20pc" /></SignatureLine><SignatureName justification="center">Steven Guilbeault</SignatureName><SignatureTitle justification="center">Minister of the Environment</SignatureTitle></SignatureBlock></entry></row></tbody></tgroup></table></TableGroup></Provision></Order><Body lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513464" lims:id="1513464"><Heading lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513465" lims:id="1513465" level="1"><TitleText>Interpretation</TitleText></Heading><Section lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:lastAmendedDate="2025-02-28" lims:fid="1513466" lims:id="1513466"><MarginalNote lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513467" lims:id="1513467">Definitions</MarginalNote><Label>1</Label><Text>The following definitions apply in this Order.</Text><Definition lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513468" lims:id="1513468"><Text><DefinedTermEn>Act</DefinedTermEn> means the <XRefExternal reference-type="act" link="I-2.75">Impact Assessment Act</XRefExternal>. (<DefinedTermFr>Loi</DefinedTermFr>)</Text></Definition><Definition lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513469" lims:id="1513469"><Text><DefinedTermEn>allied petroleum product</DefinedTermEn> has the same meaning as in section 1 of the <XRefExternal reference-type="regulation" link="SOR-2008-197">Storage Tank Systems for Petroleum Products and Allied Petroleum Products Regulations</XRefExternal>. (<DefinedTermFr>produit apparenté</DefinedTermFr>)</Text></Definition><Definition lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513470" lims:id="1513470"><Text><DefinedTermEn>building</DefinedTermEn> means a roofed physical work and includes a moveable accommodation. (<DefinedTermFr>bâtiment</DefinedTermFr>)</Text></Definition><Definition lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513471" lims:id="1513471"><Text><DefinedTermEn>developed</DefinedTermEn> with respect to land means that it is permanently altered from its natural state for human use or is landscaped and maintained for human use. (<DefinedTermFr>aménagé</DefinedTermFr>)</Text></Definition><Definition lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513472" lims:id="1513472"><Text><DefinedTermEn>expansion</DefinedTermEn> means an increase in the exterior dimensions or the production capacity of a physical work. (<DefinedTermFr>agrandissement</DefinedTermFr>)</Text></Definition><Definition lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513473" lims:id="1513473"><Text><DefinedTermEn>hook-up</DefinedTermEn> means a structure or line that is used to connect a physical work to a main gas, oil, sewer, water, power or telecommunication line. (<DefinedTermFr>raccordement</DefinedTermFr>)</Text></Definition><Definition lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513474" lims:id="1513474"><Text><DefinedTermEn>modification</DefinedTermEn> means an alteration to a physical work that does not alter the purpose or function of the work but does not include an expansion or relocation. (<DefinedTermFr>modification</DefinedTermFr>)</Text></Definition><Definition lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513475" lims:id="1513475"><Text><DefinedTermEn>petroleum product</DefinedTermEn> has the same meaning as in section 1 of the <XRefExternal reference-type="regulation" link="SOR-2008-197">Storage Tank Systems for Petroleum Products and Allied Petroleum Products Regulations</XRefExternal>. (<DefinedTermFr>produit pétrolier</DefinedTermFr>)</Text></Definition><Definition lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513476" lims:id="1513476"><Text><DefinedTermEn>water body</DefinedTermEn> includes a lake, canal, reservoir, ocean, river and its tributaries, and wetland, up to the annual high-water mark, but does not include a ditch that does not contain <DefinitionRef>fish habitat</DefinitionRef> as defined in subsection 2(1) of the <XRefExternal reference-type="act" link="F-14">Fisheries Act</XRefExternal>, a sewage or waste treatment lagoon, a mine tailings pond, an artificial irrigation pond or a dugout. (<DefinedTermFr>plan d’eau</DefinedTermFr>)</Text></Definition><Definition lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513477" lims:id="1513477"><Text><DefinedTermEn>wetland</DefinedTermEn> means an estuary, tidal flat, marsh, swamp, bog, fen or other land where the presence of water has caused the formation of hydric soils and favoured the dominance of hydrophytic or water-tolerant plants. (<DefinedTermFr>terres humides</DefinedTermFr>)</Text></Definition></Section><Section lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:lastAmendedDate="2025-02-28" lims:fid="1513478" lims:id="1513478"><MarginalNote lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513479" lims:id="1513479">Interpretation</MarginalNote><Label>2</Label><Text>Any reference to a physical work in this Order includes the systems and equipment required for the operation of a physical work including communication, electrical, heating, fire-prevention, plumbing or security systems and equipment but not including systems and equipment that produce goods or energy primarily for any purpose other than the operation of the physical work.</Text></Section><Heading lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513480" lims:id="1513480" level="1"><TitleText>Designated Classes of Projects</TitleText></Heading><Section lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:lastAmendedDate="2025-02-28" lims:fid="1513481" lims:id="1513481"><MarginalNote lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513482" lims:id="1513482">Federal lands or lands outside of Canada</MarginalNote><Label>3</Label><Subsection lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513483" lims:id="1513483"><Label>(1)</Label><Text>Subject to subsections (2) and (3), the classes of projects that are set out in Schedule 1 and carried out on federal lands or lands outside Canada are designated under section 88 of the Act.</Text></Subsection><Subsection lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513484" lims:id="1513484"><MarginalNote lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513485" lims:id="1513485">Lands administered by Parks Canada Agency</MarginalNote><Label>(2)</Label><Text>The classes of projects that are set out in Schedule 2 and carried out on federal lands administered by the Parks Canada Agency are designated under section 88 of the Act.</Text></Subsection><Subsection lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513486" lims:id="1513486"><MarginalNote lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513487" lims:id="1513487"><XRefExternal reference-type="regulation" link="C.R.C.,_c._1609">Wildlife Area Regulations</XRefExternal></MarginalNote><Label>(3)</Label><Text>The classes of projects that are set out in Schedule 3 and carried out in areas referred to in Schedule I of the <XRefExternal reference-type="regulation" link="C.R.C.,_c._1609">Wildlife Area Regulations</XRefExternal> are designated under section 88 of the Act.</Text></Subsection></Section><Section lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:lastAmendedDate="2025-02-28" lims:fid="1513488" lims:id="1513488"><MarginalNote lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513489" lims:id="1513489">Exceptions</MarginalNote><Label>4</Label><Text>The classes of projects set out in Schedules 1 to 3 do not include projects that</Text><Paragraph lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513490" lims:id="1513490"><Label>(a)</Label><Text>cause a change to</Text><Subparagraph lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513491" lims:id="1513491"><Label>(i)</Label><Text>the water level of a water body,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513492" lims:id="1513492"><Label>(ii)</Label><Text>the alignment of a watercourse,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513493" lims:id="1513493"><Label>(iii)</Label><Text>any characteristic of a wetland,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513494" lims:id="1513494"><Label>(iv)</Label><Text><DefinitionRef>wildlife species</DefinitionRef>, listed in Schedule 1 of the <XRefExternal reference-type="act" link="S-15.3">Species at Risk Act</XRefExternal>, their <DefinitionRef>residences</DefinitionRef> or <DefinitionRef>critical habitats</DefinitionRef>, as these terms are defined in subsection 2(1) of that Act;</Text></Subparagraph></Paragraph><Paragraph lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513495" lims:id="1513495"><Label>(b)</Label><Text>include any activity set out in subsection 5(1) of the <XRefExternal reference-type="regulation" link="SOR-2022-105">Migratory Birds Regulations, 2022</XRefExternal>, unless the activity is described in subsection 5(2) of those Regulations;</Text></Paragraph><Paragraph lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513496" lims:id="1513496"><Label>(c)</Label><Text>involve the release of a <DefinitionRef>deleterious substance</DefinitionRef> as defined in subsection 34(1) of the <XRefExternal reference-type="act" link="F-14">Fisheries Act</XRefExternal> into a water body;</Text></Paragraph><Paragraph lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513497" lims:id="1513497"><Label>(d)</Label><Text>involve any activity referred to in subsection 5(1) of the <XRefExternal reference-type="act">Canadian Navigable Waters Act,</XRefExternal> subsection 34.4(1), 35(1) or 36(3) of the <XRefExternal reference-type="act" link="F-14">Fisheries Act</XRefExternal> or subsection 2(1) of the <XRefExternal reference-type="regulation" link="SOR-2018-119">Scott Islands Protected Marine Area Regulations</XRefExternal>;</Text></Paragraph><Paragraph lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513498" lims:id="1513498"><Label>(e)</Label><Text>involve any prohibited activities in areas referred to in subsection 35(1) of the <XRefExternal reference-type="act" link="O-2.4">Oceans Act</XRefExternal>;</Text></Paragraph><Paragraph lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513499" lims:id="1513499"><Label>(f)</Label><Text>involve the removal of any structure or resource that is of historical, archaeological, paleontological or architectural significance; or</Text></Paragraph><Paragraph lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513500" lims:id="1513500"><Label>(g)</Label><Text>cause damage to any structure, resource or site that is of historical, archaeological, paleontological or architectural significance.</Text></Paragraph></Section><Heading lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513501" lims:id="1513501" level="1"><TitleText>Transitional Provision</TitleText></Heading><Section lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:lastAmendedDate="2025-02-28" lims:fid="1513502" lims:id="1513502"><MarginalNote lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513503" lims:id="1513503">Transitional provision</MarginalNote><Label>5</Label><Text>A designation of classes of projects that is in progress on the day on which this Order comes into force will continue according to the criteria established in the <XRefExternal reference-type="regulation" link="SOR-2019-323">Designated Classes of Projects Order</XRefExternal>.</Text></Section><Heading lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513504" lims:id="1513504" level="1"><TitleText>Repeal</TitleText></Heading><Section lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:lastAmendedDate="2025-02-28" lims:fid="1513505" lims:id="1513505" target="SOR/2019-323" type="repeal"><Label>6</Label><Text>The <XRefExternal reference-type="regulation" link="SOR-2019-323">Designated Classes of Projects Order</XRefExternal><FootnoteRef idref="fn_81000-2-5248_hq_1739201014">1</FootnoteRef> is repealed.</Text><Footnote id="fn_81000-2-5248_hq_1739201014" placement="page" status="official"><Label>1</Label><Text>SOR/2019-323</Text></Footnote></Section><Heading lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513506" lims:id="1513506" level="1"><TitleText>Coming into Force</TitleText></Heading><Section lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:lastAmendedDate="2025-02-28" lims:fid="1513507" lims:id="1513507" type="CIF"><MarginalNote lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513508" lims:id="1513508">Registration</MarginalNote><Label>7</Label><Text>This Order comes into force on the day on which it is registered.</Text></Section></Body><Schedule lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:lastAmendedDate="2025-02-28" lims:fid="1513509" lims:id="1513509"><ScheduleFormHeading lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513510" lims:id="1513510"><Label>SCHEDULE 1</Label><OriginatingRef>(Subsection 3(1) and section 4)</OriginatingRef><TitleText>Classes of Projects Carried out on Federal Lands or Lands Outside Canada</TitleText></ScheduleFormHeading><RegulationPiece lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513511" lims:id="1513511"><Heading lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513512" lims:id="1513512" level="1"><Label>PART 1</Label><TitleText>Non-specific Classes</TitleText></Heading><Section lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:lastAmendedDate="2025-02-28" lims:fid="1513513" lims:id="1513513"><Label>1</Label><Text>The operation, maintenance or repair of any physical work, whether or not the physical work is referred to in this Schedule</Text></Section><Section lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:lastAmendedDate="2025-02-28" lims:fid="1513514" lims:id="1513514"><Label>2</Label><Text>Any physical activity that is carried out entirely within the interior of a building</Text></Section><Section lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:lastAmendedDate="2025-02-28" lims:fid="1513515" lims:id="1513515"><Label>3</Label><Subsection lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513516" lims:id="1513516"><Label>(1)</Label><Text>The construction of any well used to conduct geotechnical, environmental or scientific investigations but not including projects that involve the placement of temporary or permanent fill in a water body</Text></Subsection><Subsection lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513517" lims:id="1513517"><Label>(2)</Label><Text>The decommissioning of any well referred to in subsection (1)</Text></Subsection></Section><Section lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:lastAmendedDate="2025-02-28" lims:fid="1513518" lims:id="1513518"><Label>4</Label><Text>The construction, installation, expansion, modification, decommissioning, removal, replacement or moving of a physical work that has a footprint of no more than 25 m<Sup>2</Sup> and that is not otherwise referred to in this Schedule, not including any project that involves</Text><Paragraph lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513519" lims:id="1513519"><Label>(a)</Label><Text>any work in a water body;</Text></Paragraph><Paragraph lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513520" lims:id="1513520"><Label>(b)</Label><Text>the placement of temporary or permanent fill in a water body; or</Text></Paragraph><Paragraph lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513521" lims:id="1513521"><Label>(c)</Label><Text>the disturbance of known or suspected subsurface contamination, unless the project is located within a site that is classified as closed in the <XRefExternal reference-type="other">Federal Contaminated Sites Inventory</XRefExternal> but not including sites closed that require risk management measures</Text></Paragraph></Section><Section lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:lastAmendedDate="2025-02-28" lims:fid="1513522" lims:id="1513522"><Label>5</Label><Text>The construction, installation, expansion, modification, decommissioning, removal, replacement or moving of an in-water structure that has a footprint of no more than 10 m<Sup>2</Sup> and that is not otherwise referred to in this Schedule, not including any project that involves</Text><Paragraph lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513523" lims:id="1513523"><Label>(a)</Label><Text>the placement of temporary or permanent fill in a water body;</Text></Paragraph><Paragraph lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513524" lims:id="1513524"><Label>(b)</Label><Text>the disturbance of known or suspected subsurface contamination, unless the project is located within a site that is classified as closed in the <XRefExternal reference-type="other">Federal Contaminated Sites Inventory</XRefExternal> but not including sites closed that require risk management measures;</Text></Paragraph><Paragraph lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513525" lims:id="1513525"><Label>(c)</Label><Text>the use of vehicles or heavy machinery on the substrate of a water body;</Text></Paragraph><Paragraph lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513526" lims:id="1513526"><Label>(d)</Label><Text>the placing or affixing legs or piles in the substrate or bed of a water body; or</Text></Paragraph><Paragraph lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513527" lims:id="1513527"><Label>(e)</Label><Text>the use of explosives</Text></Paragraph></Section><Heading lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513528" lims:id="1513528" level="1"><Label>PART 2</Label><TitleText>Building Classes</TitleText></Heading><Heading lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513529" lims:id="1513529" level="2"><TitleText>Interpretation and Application</TitleText></Heading><Section lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:lastAmendedDate="2025-02-28" lims:fid="1513530" lims:id="1513530"><Label>6</Label><Text>In this Part, <DefinedTermEn>special purpose building</DefinedTermEn> means a residential accommodation building, a hospital, a health centre, a fire, paramedic or police station, an educational institution, a recreational, artistic, cultural or sporting facility or a community or religious centre.</Text></Section><Section lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:lastAmendedDate="2025-02-28" lims:fid="1513531" lims:id="1513531"><Label>7</Label><Text>The classes of projects described in sections <XRefInternal>9</XRefInternal> to <XRefInternal>11</XRefInternal> do not include any project that involves</Text><Paragraph lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513532" lims:id="1513532"><Label>(a)</Label><Text>the placement of temporary or permanent fill in a water body;</Text></Paragraph><Paragraph lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513533" lims:id="1513533"><Label>(b)</Label><Text>the disturbance of known or suspected subsurface contamination, unless the project is located within a site that is classified as closed in the <XRefExternal reference-type="other">Federal Contaminated Sites Inventory</XRefExternal> but not including sites closed that require risk management measures; or</Text></Paragraph><Paragraph lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513534" lims:id="1513534"><Label>(c)</Label><Text>the demolition of a building or special purpose building that is less than 30 m from a school, hospital or residential building.</Text></Paragraph></Section><Section lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:lastAmendedDate="2025-02-28" lims:fid="1513535" lims:id="1513535"><Label>8</Label><Text>This Part applies to any building, special purpose building, prefabricated structure or tent pad.</Text></Section><Heading lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513536" lims:id="1513536" level="2"><TitleText>Physical Works — Developed Land</TitleText></Heading><Section lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:lastAmendedDate="2025-02-28" lims:fid="1513537" lims:id="1513537"><Label>9</Label><Subsection lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513538" lims:id="1513538"><Label>(1)</Label><Text>On developed land, the construction, installation, decommissioning, removal, replacement, moving or demolition of</Text><Paragraph lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513539" lims:id="1513539"><Label>(a)</Label><Text>any building that has a footprint of no more than 1000 m<Sup>2</Sup>; and</Text></Paragraph><Paragraph lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513540" lims:id="1513540"><Label>(b)</Label><Text>any special purpose building that has a footprint of no more than 1500 m<Sup>2</Sup></Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513541" lims:id="1513541"><Label>(2)</Label><Text>On developed land, the construction, installation, decommissioning, removal, replacement or moving of</Text><Paragraph lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513542" lims:id="1513542"><Label>(a)</Label><Text>any prefabricated structure that has a footprint of no more than 1000 m<Sup>2</Sup>; and</Text></Paragraph><Paragraph lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513543" lims:id="1513543"><Label>(b)</Label><Text>any tent pad that has a footprint of no more than 1000 m<Sup>2</Sup></Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513544" lims:id="1513544"><Label>(3)</Label><Text>On developed land, the expansion of any building, special purpose building, prefabricated structure or tent pad, provided that the total footprint of all expansions of that physical work is no more than 1000 m<Sup>2</Sup></Text></Subsection></Section><Heading lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513545" lims:id="1513545" level="2"><TitleText>Physical Works — Land That is not Developed</TitleText></Heading><Section lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:lastAmendedDate="2025-02-28" lims:fid="1513546" lims:id="1513546"><Label>10</Label><Subsection lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513547" lims:id="1513547"><Label>(1)</Label><Text>On land that is not developed, the construction, installation, decommissioning, removal, replacement or moving of</Text><Paragraph lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513548" lims:id="1513548"><Label>(a)</Label><Text>any building that has a footprint of no more than 100 m<Sup>2</Sup>;</Text></Paragraph><Paragraph lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513549" lims:id="1513549"><Label>(b)</Label><Text>any prefabricated structure that has a footprint of no more than 100 m<Sup>2</Sup>;</Text></Paragraph><Paragraph lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513550" lims:id="1513550"><Label>(c)</Label><Text>any tent pad that has a footprint of no more than 100 m<Sup>2</Sup>; or</Text></Paragraph><Paragraph lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513551" lims:id="1513551"><Label>(d)</Label><Text>any special purpose building that has a footprint of no more than 500 m<Sup>2</Sup></Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513552" lims:id="1513552"><Label>(2)</Label><Text>On land that is not developed, the expansion of any building, special purpose building, prefabricated structure or tent pad, provided that the total footprint of all expansions of that physical work is no more than 100 m<Sup>2</Sup></Text></Subsection></Section><Section lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:lastAmendedDate="2025-02-28" lims:fid="1513553" lims:id="1513553"><Label>11</Label><Text>The modification of any building, special purpose building, prefabricated structure or tent pad</Text></Section><Heading lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513554" lims:id="1513554" level="1"><Label>PART 3</Label><TitleText>Physical Works or Related Physical Works</TitleText></Heading><Heading lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513555" lims:id="1513555" level="2"><TitleText>Interpretation and Application</TitleText></Heading><Section lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:lastAmendedDate="2025-02-28" lims:fid="1513556" lims:id="1513556"><Label>12</Label><Text>In this Part, <DefinedTermEn>physical work</DefinedTermEn> means</Text><Paragraph lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513557" lims:id="1513557"><Label>(a)</Label><Text>a lighting system;</Text></Paragraph><Paragraph lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513558" lims:id="1513558"><Label>(b)</Label><Text>signage;</Text></Paragraph><Paragraph lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513559" lims:id="1513559"><Label>(c)</Label><Text>fire suppression infrastructure;</Text></Paragraph><Paragraph lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513560" lims:id="1513560"><Label>(d)</Label><Text>a parking lot;</Text></Paragraph><Paragraph lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513561" lims:id="1513561"><Label>(e)</Label><Text>a paved area;</Text></Paragraph><Paragraph lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513562" lims:id="1513562"><Label>(f)</Label><Text>an access road;</Text></Paragraph><Paragraph lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513563" lims:id="1513563"><Label>(g)</Label><Text>a charging station for electric vehicles;</Text></Paragraph><Paragraph lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513564" lims:id="1513564"><Label>(h)</Label><Text>infrastructure that generates solar or wind power;</Text></Paragraph><Paragraph lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513565" lims:id="1513565"><Label>(i)</Label><Text>a gravel or stone dust area;</Text></Paragraph><Paragraph lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513566" lims:id="1513566"><Label>(j)</Label><Text>an accessibility structure for active transportation;</Text></Paragraph><Paragraph lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513567" lims:id="1513567"><Label>(k)</Label><Text>an awning;</Text></Paragraph><Paragraph lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513568" lims:id="1513568"><Label>(l)</Label><Text>a bollard;</Text></Paragraph><Paragraph lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513569" lims:id="1513569"><Label>(m)</Label><Text>a security system;</Text></Paragraph><Paragraph lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513570" lims:id="1513570"><Label>(n)</Label><Text>a heating, ventilation and air conditioning (HVAC) system; and</Text></Paragraph><Paragraph lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513571" lims:id="1513571"><Label>(o)</Label><Text>an air pollution control system.</Text></Paragraph></Section><Section lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:lastAmendedDate="2025-02-28" lims:fid="1513572" lims:id="1513572"><Label>13</Label><Text>The classes of projects described in sections <XRefInternal>15</XRefInternal> to <XRefInternal>17</XRefInternal> do not include any project that involves</Text><Paragraph lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513573" lims:id="1513573"><Label>(a)</Label><Text>the placement of temporary or permanent fill in a water body; or</Text></Paragraph><Paragraph lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513574" lims:id="1513574"><Label>(b)</Label><Text>the disturbance of known or suspected subsurface contamination, unless the project is located within a site that is classified as closed in the <XRefExternal reference-type="other">Federal Contaminated Sites Inventory</XRefExternal> but not including sites closed that require risk management measures.</Text></Paragraph></Section><Section lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:lastAmendedDate="2025-02-28" lims:fid="1513575" lims:id="1513575"><Label>14</Label><Text>A physical work is a related physical work when it refers to a physical work that is related to an existing building or other structure.</Text></Section><Heading lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513576" lims:id="1513576" level="2"><TitleText>Physical Works — Developed Land</TitleText></Heading><Section lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:lastAmendedDate="2025-02-28" lims:fid="1513577" lims:id="1513577"><Label>15</Label><Subsection lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513578" lims:id="1513578"><Label>(1)</Label><Text>On developed land, the construction, installation or moving of any related physical work that has a footprint of no more than 1000 m<Sup>2</Sup></Text></Subsection><Subsection lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513579" lims:id="1513579"><Label>(2)</Label><Text>On developed land, the expansion of any related physical work provided that the total footprint of all expansions of that physical work is no more than 1000 m<Sup>2</Sup></Text></Subsection><Subsection lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513580" lims:id="1513580"><Label>(3)</Label><Text>On developed land, the decommissioning, removal or replacement of any physical work that has a footprint of no more than 1000 m<Sup>2</Sup></Text></Subsection></Section><Heading lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513581" lims:id="1513581" level="2"><TitleText>Physical Works — Land That Is Not Developed</TitleText></Heading><Section lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:lastAmendedDate="2025-02-28" lims:fid="1513582" lims:id="1513582"><Label>16</Label><Subsection lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513583" lims:id="1513583"><Label>(1)</Label><Text>On land that is not developed, the construction, installation or moving of any related physical work for which the footprint is no more than 100 m<Sup>2</Sup></Text></Subsection><Subsection lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513584" lims:id="1513584"><Label>(2)</Label><Text>On land that is not developed, the expansion of any related physical work, provided that the total footprint of all expansions of that physical work is no more than 100 m<Sup>2</Sup></Text></Subsection><Subsection lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513585" lims:id="1513585"><Label>(3)</Label><Text>On land that is not developed, the decommissioning, removal or replacement of any physical work that has a footprint of no more than 100 m<Sup>2</Sup></Text></Subsection></Section><Section lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:lastAmendedDate="2025-02-28" lims:fid="1513586" lims:id="1513586"><Label>17</Label><Text>The modification of any physical work or related physical work</Text></Section><Heading lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513587" lims:id="1513587" level="1"><Label>PART 4</Label><TitleText>Utility Infrastructure</TitleText></Heading><Heading lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513588" lims:id="1513588" level="2"><TitleText>Application</TitleText></Heading><Section lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:lastAmendedDate="2025-02-28" lims:fid="1513589" lims:id="1513589"><Label>18</Label><Text>This Part applies to any hydrant, hook-up, water-related utility infrastructure — other than a water pipeline or water treatment facility — septic system, water treatment facility, utility infrastructure set out in section <XRefInternal>23</XRefInternal> or electrical substation.</Text></Section><Section lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:lastAmendedDate="2025-02-28" lims:fid="1513590" lims:id="1513590"><Label>19</Label><Subsection lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513591" lims:id="1513591"><Label>(1)</Label><Text>The classes of projects described in sections <XRefInternal>20</XRefInternal> to <XRefInternal>22</XRefInternal> do not include any project that involves</Text><Paragraph lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513592" lims:id="1513592"><Label>(a)</Label><Text>the placement of temporary or permanent fill in a water body;</Text></Paragraph><Paragraph lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513593" lims:id="1513593"><Label>(b)</Label><Text>the crossing of a water body, other than an overhead crossing by a telecommunication line or an electrical transmission or distribution line of 130 kV or less; or</Text></Paragraph><Paragraph lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513594" lims:id="1513594"><Label>(c)</Label><Text>the disturbance of known or suspected subsurface contamination, unless the project is located within a site that is classified as closed in the <XRefExternal reference-type="other">Federal Contaminated Sites Inventory</XRefExternal> but not including sites closed that require risk management measures.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513595" lims:id="1513595"><Label>(2)</Label><Text>The class of projects described in section <XRefInternal>21</XRefInternal> does not include any project that involves the use of</Text><Paragraph lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513596" lims:id="1513596"><Label>(a)</Label><Text>vehicles or heavy machinery on the substrate of a water body; or</Text></Paragraph><Paragraph lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513597" lims:id="1513597"><Label>(b)</Label><Text>explosives.</Text></Paragraph></Subsection></Section><Heading lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513598" lims:id="1513598" level="2"><TitleText>Hydrants and Hook-ups</TitleText></Heading><Section lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:lastAmendedDate="2025-02-28" lims:fid="1513599" lims:id="1513599"><Label>20</Label><Text>The installation, modification, decommissioning, abandonment, removal or replacement of a hydrant or hook-up that is part of a utility distribution system</Text></Section><Heading lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513600" lims:id="1513600" level="2"><TitleText>Water-related Utility Infrastructure</TitleText></Heading><Section lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:lastAmendedDate="2025-02-28" lims:fid="1513601" lims:id="1513601"><Label>21</Label><Subsection lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513602" lims:id="1513602"><Label>(1)</Label><Text>The construction or installation of any water-related utility infrastructure that has a footprint of no more than 100 m<Sup>2</Sup></Text></Subsection><Subsection lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513603" lims:id="1513603"><Label>(2)</Label><Text>The expansion of any water-related utility infrastructure referred to in subsection (1), provided that expansion does not increase the total footprint of that water-related infrastructure to more than the limit set out in that subsection</Text></Subsection><Subsection lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513604" lims:id="1513604"><Label>(3)</Label><Text>The decommissioning, removal or replacement of any water-related utility infrastructure that has a footprint of no more than 1000 m<Sup>2</Sup></Text></Subsection><Subsection lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513605" lims:id="1513605"><Label>(4)</Label><Text>The modification of any water-related utility infrastructure that has a footprint of no more than 1000 m<Sup>2</Sup></Text></Subsection><Subsection lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513606" lims:id="1513606"><Label>(5)</Label><Text>The modification of a water treatment facility</Text></Subsection></Section><Section lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:lastAmendedDate="2025-02-28" lims:fid="1513607" lims:id="1513607"><Label>22</Label><Subsection lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513608" lims:id="1513608"><Label>(1)</Label><Text>On developed land, the installation, expansion, removal or replacement of a septic system that has a footprint of no more than 1000 m<Sup>2</Sup> and that is located more than 30 m from a water body</Text></Subsection><Subsection lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513609" lims:id="1513609"><Label>(2)</Label><Text>The modification of any septic system</Text></Subsection></Section><Heading lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513610" lims:id="1513610" level="2"><TitleText>Interpretation</TitleText></Heading><Section lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:lastAmendedDate="2025-02-28" lims:fid="1513611" lims:id="1513611"><Label>23</Label><Text>For the purposes of sections <XRefInternal>25</XRefInternal> to <XRefInternal>29</XRefInternal>, <DefinedTermEn>utility infrastructure</DefinedTermEn> means</Text><Paragraph lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513612" lims:id="1513612"><Label>(a)</Label><Text>a water pipeline;</Text></Paragraph><Paragraph lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513613" lims:id="1513613"><Label>(b)</Label><Text>a sewer;</Text></Paragraph><Paragraph lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513614" lims:id="1513614"><Label>(c)</Label><Text>a drain;</Text></Paragraph><Paragraph lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513615" lims:id="1513615"><Label>(d)</Label><Text>a steam line;</Text></Paragraph><Paragraph lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513616" lims:id="1513616"><Label>(e)</Label><Text>a service tunnel;</Text></Paragraph><Paragraph lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513617" lims:id="1513617"><Label>(f)</Label><Text>an overhead or underground telecommunication line; and</Text></Paragraph><Paragraph lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513618" lims:id="1513618"><Label>(g)</Label><Text>an overhead or underground electrical transmission or distribution line of 130 kV or less, other than an interprovincial or international line.</Text></Paragraph></Section><Section lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:lastAmendedDate="2025-02-28" lims:fid="1513619" lims:id="1513619"><Label>24</Label><Subsection lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513620" lims:id="1513620"><Label>(1)</Label><Text>The classes of projects described in sections <XRefInternal>25</XRefInternal> to <XRefInternal>29</XRefInternal> do not include any project that involves</Text><Paragraph lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513621" lims:id="1513621"><Label>(a)</Label><Text>the placement of temporary or permanent fill in a water body;</Text></Paragraph><Paragraph lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513622" lims:id="1513622"><Label>(b)</Label><Text>the crossing of a water body, other than an overhead crossing by a telecommunication line or an electrical transmission or distribution line of 130 kV or less; or</Text></Paragraph><Paragraph lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513623" lims:id="1513623"><Label>(c)</Label><Text>the disturbance of known or suspected subsurface contamination, unless the project is located within a site that is classified as closed in the <XRefExternal reference-type="other">Federal Contaminated Sites Inventory</XRefExternal> but not including sites closed that require risk management measures.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513624" lims:id="1513624"><Label>(2)</Label><Text>The classes of projects described in sections <XRefInternal>27</XRefInternal> to <XRefInternal>29</XRefInternal> do not include any project for which the electrical transmission or distribution line referred to in paragraph <XRefInternal>23</XRefInternal>(g) is located</Text><Paragraph lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513625" lims:id="1513625"><Label>(a)</Label><Text>in a protected marine area established under subsection 4.1(1) of the <XRefExternal reference-type="act" link="W-9">Canada Wildlife Act</XRefExternal>; or</Text></Paragraph><Paragraph lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513626" lims:id="1513626"><Label>(b)</Label><Text>in an area set out in the schedule to the <XRefExternal reference-type="regulation" link="C.R.C.,_c._1036">Migratory Bird Sanctuary Regulations</XRefExternal>, prescribed as a migratory bird sanctuary.</Text></Paragraph></Subsection></Section><Heading lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513627" lims:id="1513627" level="2"><TitleText>Utility Infrastructure</TitleText></Heading><Section lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:lastAmendedDate="2025-02-28" lims:fid="1513628" lims:id="1513628"><Label>25</Label><Subsection lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513629" lims:id="1513629"><Label>(1)</Label><Text>The construction or installation of any utility infrastructure referred to in paragraph <XRefInternal>23</XRefInternal>(a), (f) or (g) that is no more than 100 m in length</Text></Subsection><Subsection lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513630" lims:id="1513630"><Label>(2)</Label><Text>The lengthening of any utility infrastructure referred to in subsection (1) if the length of the utility infrastructure and the lengthening is no more than 100 m</Text></Subsection><Subsection lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513631" lims:id="1513631"><Label>(3)</Label><Text>The modification, decommissioning, removal or replacement of any utility infrastructure referred to in paragraph <XRefInternal>23</XRefInternal>(a), (f) or (g) that is no more than 1000 m</Text></Subsection><Subsection lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513632" lims:id="1513632"><Label>(4)</Label><Text>The construction, installation, lengthening, modification, decommissioning, removal or replacement of any utility infrastructure referred to in paragraph <XRefInternal>23</XRefInternal>(a), (f) or (g), of any length, that is located</Text><Paragraph lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513633" lims:id="1513633"><Label>(a)</Label><Text>underneath a railway, road or airport pavement;</Text></Paragraph><Paragraph lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513634" lims:id="1513634"><Label>(b)</Label><Text>alongside and contiguous to the infrastructure referred to in paragraph (a), if on developed land; or</Text></Paragraph><Paragraph lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513635" lims:id="1513635"><Label>(c)</Label><Text>within the right of way of a telecommunication or electrical line</Text></Paragraph></Subsection></Section><Section lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:lastAmendedDate="2025-02-28" lims:fid="1513636" lims:id="1513636"><Label>26</Label><Subsection lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513637" lims:id="1513637"><Label>(1)</Label><Text>The modification, removal or replacement, more than 30 m from a water body, of any utility infrastructure referred to in any of paragraphs <XRefInternal>23</XRefInternal>(b) to (e) that is no more than 1000 m in length</Text></Subsection><Subsection lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513638" lims:id="1513638"><Label>(2)</Label><Text>The construction, installation, lengthening, modification, abandonment, removal or replacement, more than 30 m from a water body, of any utility infrastructure referred to in any of paragraphs <XRefInternal>23</XRefInternal>(b) to (e), of any length, that is located</Text><Paragraph lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513639" lims:id="1513639"><Label>(a)</Label><Text>underneath a railway, road or airport pavement;</Text></Paragraph><Paragraph lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513640" lims:id="1513640"><Label>(b)</Label><Text>alongside or contiguous to the infrastructure referred to in paragraph (a), if it is located on developed land; or</Text></Paragraph><Paragraph lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513641" lims:id="1513641"><Label>(c)</Label><Text>within the right of way of a telecommunication or electrical line</Text></Paragraph></Subsection></Section><Heading lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513642" lims:id="1513642" level="2"><TitleText>Electrical Substations</TitleText></Heading><Section lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:lastAmendedDate="2025-02-28" lims:fid="1513643" lims:id="1513643"><Label>27</Label><Subsection lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513644" lims:id="1513644"><Label>(1)</Label><Text>On developed land, the construction, installation, decommissioning, removal or replacement of an electrical substation that has a footprint of no more than 1000 m<Sup>2</Sup> and that is linked to an electrical transmission or distribution line referred to in paragraph <XRefInternal>23</XRefInternal>(g)</Text></Subsection><Subsection lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513645" lims:id="1513645"><Label>(2)</Label><Text>On developed land, the expansion of an electrical substation referred to in subsection (1), provided that expansion does not increase the total footprint of that electrical substation to more than the limit set out in that subsection</Text></Subsection></Section><Section lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:lastAmendedDate="2025-02-28" lims:fid="1513646" lims:id="1513646"><Label>28</Label><Subsection lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513647" lims:id="1513647"><Label>(1)</Label><Text>On land that is not developed, the construction or installation of an electrical substation that has a footprint of no more than 100 m<Sup>2</Sup> and that is linked to an electrical transmission or distribution line referred to in paragraph <XRefInternal>23</XRefInternal>(g)</Text></Subsection><Subsection lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513648" lims:id="1513648"><Label>(2)</Label><Text>On land that is not developed, the expansion of an electrical substation referred to in subsection (1), provided that expansion does not increase the total footprint of that electrical substation to more than the limit set out in that subsection</Text></Subsection></Section><Section lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:lastAmendedDate="2025-02-28" lims:fid="1513649" lims:id="1513649"><Label>29</Label><Text>The modification of any electrical substation that is linked to an electrical transmission or distribution line referred to in paragraph <XRefInternal>23</XRefInternal>(g)</Text></Section><Heading lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513650" lims:id="1513650" level="1"><Label>PART 5</Label><TitleText>Storage Tank Systems</TitleText></Heading><Heading lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513651" lims:id="1513651" level="2"><TitleText>Application</TitleText></Heading><Section lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:lastAmendedDate="2025-02-28" lims:fid="1513652" lims:id="1513652"><Label>30</Label><Text>The classes of projects described in sections <XRefInternal>32</XRefInternal> and <XRefInternal>33</XRefInternal> do not include any project that involves the disturbance of known or suspected subsurface contamination, unless the project is located within a site that is classified as closed in the <XRefExternal reference-type="other">Federal Contaminated Sites Inventory</XRefExternal> but not including sites closed that require risk management measures.</Text></Section><Section lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:lastAmendedDate="2025-02-28" lims:fid="1513653" lims:id="1513653"><Label>31</Label><Text>This Part applies to any storage tank system for petroleum products or allied petroleum products.</Text></Section><Heading lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513654" lims:id="1513654" level="2"><TitleText>Storage</TitleText></Heading><Section lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:lastAmendedDate="2025-02-28" lims:fid="1513655" lims:id="1513655"><Label>32</Label><Subsection lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513656" lims:id="1513656"><Label>(1)</Label><Text>The installation, removal or replacement of a storage tank system for petroleum products or allied petroleum products that has an aggregate capacity of</Text><Paragraph lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513657" lims:id="1513657"><Label>(a)</Label><Text>no more than 30 000 L if it is located above ground within an airport; or</Text></Paragraph><Paragraph lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513658" lims:id="1513658"><Label>(b)</Label><Text>no more than 5000 L in any other case</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513659" lims:id="1513659"><Label>(2)</Label><Text>The increase of the capacity of a storage tank system referred to in subsection (1), provided that increase does not exceed the aggregate capacity limit set out in that subsection</Text></Subsection></Section><Section lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:lastAmendedDate="2025-02-28" lims:fid="1513660" lims:id="1513660"><Label>33</Label><Text>The modification of any storage tank system for petroleum products or allied petroleum products</Text></Section><Heading lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513661" lims:id="1513661" level="1"><Label>PART 6</Label><TitleText>Linear Infrastructures</TitleText></Heading><Heading lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513662" lims:id="1513662" level="2"><TitleText>Interpretation and Application</TitleText></Heading><Section lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:lastAmendedDate="2025-02-28" lims:fid="1513663" lims:id="1513663"><Label>34</Label><Text>In this Part, <DefinedTermEn>linear infrastructure</DefinedTermEn> means</Text><Paragraph lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513664" lims:id="1513664"><Label>(a)</Label><Text>a runway, taxiway or runway end safety area of an aerodrome;</Text></Paragraph><Paragraph lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513665" lims:id="1513665"><Label>(b)</Label><Text>a railway;</Text></Paragraph><Paragraph lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513666" lims:id="1513666"><Label>(c)</Label><Text>a road that is not an access road; and</Text></Paragraph><Paragraph lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513667" lims:id="1513667"><Label>(d)</Label><Text>a guardrail, handrail, curb, fence or gate.</Text></Paragraph></Section><Section lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:lastAmendedDate="2025-02-28" lims:fid="1513668" lims:id="1513668"><Label>35</Label><Text>The classes of projects described in sections <XRefInternal>37</XRefInternal> to <XRefInternal>40</XRefInternal> do not include any project that involves</Text><Paragraph lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513669" lims:id="1513669"><Label>(a)</Label><Text>the placement of temporary or permanent fill in a water body; or</Text></Paragraph><Paragraph lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513670" lims:id="1513670"><Label>(b)</Label><Text>the disturbance of known or suspected subsurface contamination, unless the project is located within a site that is classified as closed in the <XRefExternal reference-type="other">Federal Contaminated Sites Inventory</XRefExternal> but not including sites closed that require risk management measures.</Text></Paragraph></Section><Section lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:lastAmendedDate="2025-02-28" lims:fid="1513671" lims:id="1513671"><Label>36</Label><Text>This Part applies to any linear infrastructure.</Text></Section><Heading lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513672" lims:id="1513672" level="2"><TitleText>Aerodromes</TitleText></Heading><Section lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:lastAmendedDate="2025-02-28" lims:fid="1513673" lims:id="1513673"><Label>37</Label><Subsection lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513674" lims:id="1513674"><Label>(1)</Label><Text>The decommissioning, removal or replacement of any linear infrastructure referred to in paragraph <XRefInternal>34</XRefInternal>(a) that is no more than 150 m in length</Text></Subsection><Subsection lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513675" lims:id="1513675"><Label>(2)</Label><Text>The lengthening of any linear infrastructure referred to in paragraph <XRefInternal>34</XRefInternal>(a), if the lengthening is no more than 150 m and does not increase the aircraft group number that the linear infrastructure can service</Text></Subsection><Subsection lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513676" lims:id="1513676"><Label>(3)</Label><Text>The modification of any linear infrastructure referred to in paragraph <XRefInternal>34</XRefInternal>(a)</Text></Subsection></Section><Heading lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513677" lims:id="1513677" level="2"><TitleText>Railway Lines</TitleText></Heading><Section lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:lastAmendedDate="2025-02-28" lims:fid="1513678" lims:id="1513678"><Label>38</Label><Subsection lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513679" lims:id="1513679"><Label>(1)</Label><Text>The decommissioning, removal or replacement of any linear infrastructure referred to in paragraph <XRefInternal>34</XRefInternal>(b) that is no more than 100 m in length</Text></Subsection><Subsection lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513680" lims:id="1513680"><Label>(2)</Label><Text>On developed land, the lengthening of any linear infrastructure referred to in paragraph <XRefInternal>34</XRefInternal>(b) that is within or runs alongside an existing railway or road right of way, if the lengthening is no more than 100 m</Text></Subsection><Subsection lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513681" lims:id="1513681"><Label>(3)</Label><Text>The modification of any linear infrastructure referred to in paragraph <XRefInternal>34</XRefInternal>(b)</Text></Subsection></Section><Heading lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513682" lims:id="1513682" level="2"><TitleText>Roads</TitleText></Heading><Section lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:lastAmendedDate="2025-02-28" lims:fid="1513683" lims:id="1513683"><Label>39</Label><Subsection lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513684" lims:id="1513684"><Label>(1)</Label><Text>The decommissioning, removal, or replacement of a linear infrastructure referred to in paragraph <XRefInternal>34</XRefInternal>(c) that is no more than 100 m in length</Text></Subsection><Subsection lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513685" lims:id="1513685"><Label>(2)</Label><Text>On developed land, the lengthening or widening of any linear infrastructure referred to in paragraph <XRefInternal>34</XRefInternal>(c) that is within or runs alongside an existing rail or road right of way, if the lengthening is no more than 100 m and the widening is by one lane of no more than 100 m</Text></Subsection><Subsection lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513686" lims:id="1513686"><Label>(3)</Label><Text>The modification of any linear infrastructure referred to in paragraph <XRefInternal>34</XRefInternal>(c)</Text></Subsection></Section><Heading lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513687" lims:id="1513687" level="2"><TitleText>Security Infrastructures</TitleText></Heading><Section lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:lastAmendedDate="2025-02-28" lims:fid="1513688" lims:id="1513688"><Label>40</Label><Subsection lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513689" lims:id="1513689"><Label>(1)</Label><Text>The construction or installation of any linear infrastructure referred to in paragraph <XRefInternal>34</XRefInternal>(d) that is related to a building or other structure and that is no more than 100 m in length</Text></Subsection><Subsection lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513690" lims:id="1513690"><Label>(2)</Label><Text>The lengthening of any linear infrastructure referred to in paragraph <XRefInternal>34</XRefInternal>(d), if the lengthening is no more than 100 m in length</Text></Subsection><Subsection lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513691" lims:id="1513691"><Label>(3)</Label><Text>The modification, decommissioning, removal or replacement of any linear infrastructure referred to in paragraph <XRefInternal>34</XRefInternal>(d)</Text></Subsection></Section><Heading lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513692" lims:id="1513692" level="1"><Label>PART 7</Label><TitleText>Transportation and Mobility Projects</TitleText></Heading><Heading lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513693" lims:id="1513693" level="2"><TitleText>Application</TitleText></Heading><Section lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:lastAmendedDate="2025-02-28" lims:fid="1513694" lims:id="1513694"><Label>41</Label><Subsection lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513695" lims:id="1513695"><Label>(1)</Label><Text>The classes of projects described in sections <XRefInternal>43</XRefInternal> to <XRefInternal>49</XRefInternal> do not include any project that involves</Text><Paragraph lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513696" lims:id="1513696"><Label>(a)</Label><Text>the placement of temporary or permanent fill in a water body; or</Text></Paragraph><Paragraph lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513697" lims:id="1513697"><Label>(b)</Label><Text>the disturbance of known or suspected subsurface contamination, unless the project is located within a site that is classified as closed in the <XRefExternal reference-type="other">Federal Contaminated Sites Inventory</XRefExternal> but not including sites closed that require risk management measures.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513698" lims:id="1513698"><Label>(2)</Label><Text>The classes of projects described in sections <XRefInternal>44</XRefInternal> and <XRefInternal>47</XRefInternal> do not include any project that involves</Text><Paragraph lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513699" lims:id="1513699"><Label>(a)</Label><Text>activities within a water body; or</Text></Paragraph><Paragraph lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513700" lims:id="1513700"><Label>(b)</Label><Text>a crossing of an international or interprovincial boundary or the St. Lawrence seaway.</Text></Paragraph></Subsection></Section><Section lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:lastAmendedDate="2025-02-28" lims:fid="1513701" lims:id="1513701"><Label>42</Label><Text>This Part applies to any air transportation navigational aid, clear span bridge, sidewalk, boardwalk, path or trail.</Text></Section><Heading lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513702" lims:id="1513702" level="2"><TitleText>Transportation — Developed Land</TitleText></Heading><Section lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:lastAmendedDate="2025-02-28" lims:fid="1513703" lims:id="1513703"><Label>43</Label><Subsection lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513704" lims:id="1513704"><Label>(1)</Label><Text>On developed land, the construction, installation, decommissioning, removal or replacement of an air transportation navigational aid that has a footprint of no more than 1000 m<Sup>2</Sup></Text></Subsection><Subsection lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513705" lims:id="1513705"><Label>(2)</Label><Text>On developed land, the expansion of any air transportation navigational aid, provided that the total footprint of all expansions of that physical work is no more than 1000 m<Sup>2</Sup></Text></Subsection></Section><Section lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:lastAmendedDate="2025-02-28" lims:fid="1513706" lims:id="1513706"><Label>44</Label><Subsection lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513707" lims:id="1513707"><Label>(1)</Label><Text>On developed land, the construction or installation of a clear span bridge that is related to a building or structure and that has a footprint of no more than 1000 m<Sup>2</Sup></Text></Subsection><Subsection lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513708" lims:id="1513708"><Label>(2)</Label><Text>On developed land, the expansion of a clear span bridge referred to in subsection (1), provided that expansion does not increase the total footprint of that clear span bridge to more than the limit set out in that subsection</Text></Subsection><Subsection lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513709" lims:id="1513709"><Label>(3)</Label><Text>On developed land, the decommissioning, removal or replacement of a clear span bridge that has a footprint of no more than 1000 m<Sup>2</Sup></Text></Subsection></Section><Heading lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513710" lims:id="1513710" level="2"><TitleText>Mobility — Developed Land</TitleText></Heading><Section lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:lastAmendedDate="2025-02-28" lims:fid="1513711" lims:id="1513711"><Label>45</Label><Subsection lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513712" lims:id="1513712"><Label>(1)</Label><Text>On developed land, the construction or installation of a sidewalk, boardwalk, path or trail that is related to a building or other structure and that has a footprint of no more than 1000 m<Sup>2</Sup></Text></Subsection><Subsection lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513713" lims:id="1513713"><Label>(2)</Label><Text>On developed land, the expansion of any sidewalk, boardwalk, path or trail that is related to a building or other structure, provided that the total footprint of all expansions of that physical work is no more than 1000 m<Sup>2</Sup></Text></Subsection><Subsection lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513714" lims:id="1513714"><Label>(3)</Label><Text>On developed land, the decommissioning, removal or replacement of any sidewalk, boardwalk, path or trail that has a footprint of no more than 1000 m<Sup>2</Sup></Text></Subsection></Section><Heading lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513715" lims:id="1513715" level="2"><TitleText>Transportation — Land That Is Not Developed</TitleText></Heading><Section lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:lastAmendedDate="2025-02-28" lims:fid="1513716" lims:id="1513716"><Label>46</Label><Subsection lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513717" lims:id="1513717"><Label>(1)</Label><Text>On land that is not developed, the construction, installation, decommissioning, removal or replacement of an air transportation navigational aid that has a footprint of no more than 100 m<Sup>2</Sup></Text></Subsection><Subsection lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513718" lims:id="1513718"><Label>(2)</Label><Text>On land that is not developed, the expansion of any air transportation navigational aid, provided that the total footprint of all expansions of that physical work is no more than 100 m<Sup>2</Sup></Text></Subsection></Section><Section lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:lastAmendedDate="2025-02-28" lims:fid="1513719" lims:id="1513719"><Label>47</Label><Subsection lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513720" lims:id="1513720"><Label>(1)</Label><Text>On land that is not developed, the construction or installation of a clear span bridge that is related to a building or structure and that has a footprint of no more than 100 m<Sup>2</Sup></Text></Subsection><Subsection lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513721" lims:id="1513721"><Label>(2)</Label><Text>On land that is not developed, the expansion of a clear span bridge referred to in subsection (1), provided that expansion does not increase the total footprint of that clear span bridge to more than the limit set out in that subsection</Text></Subsection><Subsection lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513722" lims:id="1513722"><Label>(3)</Label><Text>On land that is not developed, the decommissioning, removal or replacement of a clear span bridge that has a footprint of no more than 100 m<Sup>2</Sup></Text></Subsection></Section><Heading lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513723" lims:id="1513723" level="2"><TitleText>Mobility — Land That Is Not Developed</TitleText></Heading><Section lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:lastAmendedDate="2025-02-28" lims:fid="1513724" lims:id="1513724"><Label>48</Label><Subsection lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513725" lims:id="1513725"><Label>(1)</Label><Text>On land that is not developed, the construction or installation of any sidewalk, boardwalk, path or trail that is related to a building or structure and that has a footprint of no more than 100 m<Sup>2</Sup></Text></Subsection><Subsection lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513726" lims:id="1513726"><Label>(2)</Label><Text>On land that is not developed, the expansion of any sidewalk, boardwalk, path or trail that is related to a building or other structure, provided that the total footprint of all expansions of that physical work is no more than 100 m<Sup>2</Sup></Text></Subsection><Subsection lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513727" lims:id="1513727"><Label>(3)</Label><Text>On land that is not developed, the decommissioning, removal or replacement of any sidewalk, boardwalk, path or trail that has a footprint of no more than 100 m<Sup>2</Sup></Text></Subsection></Section><Section lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:lastAmendedDate="2025-02-28" lims:fid="1513728" lims:id="1513728"><Label>49</Label><Text>The modification of any air transportation navigational aid, clear span bridge, sidewalk, boardwalk, path or trail</Text></Section><Heading lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513729" lims:id="1513729" level="1"><Label>PART 8</Label><TitleText>Structures in or Near Water</TitleText></Heading><Heading lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513730" lims:id="1513730" level="2"><TitleText>Interpretation Application</TitleText></Heading><Section lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:lastAmendedDate="2025-02-28" lims:fid="1513731" lims:id="1513731"><Label>50</Label><Text>For the purposes of sections <XRefInternal>52</XRefInternal> and <XRefInternal>55</XRefInternal>, <DefinedTermEn>other physical work</DefinedTermEn> means</Text><Paragraph lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513732" lims:id="1513732"><Label>(a)</Label><Text>a retaining wall;</Text></Paragraph><Paragraph lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513733" lims:id="1513733"><Label>(b)</Label><Text>a breakwater;</Text></Paragraph><Paragraph lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513734" lims:id="1513734"><Label>(c)</Label><Text>a shoreline stabilization work; and</Text></Paragraph><Paragraph lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513735" lims:id="1513735"><Label>(d)</Label><Text>a fishway or a fish ladder.</Text></Paragraph></Section><Section lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:lastAmendedDate="2025-02-28" lims:fid="1513736" lims:id="1513736"><Label>51</Label><Subsection lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513737" lims:id="1513737"><Label>(1)</Label><Text>The classes of projects described in sections <XRefInternal>53</XRefInternal> to <XRefInternal>57</XRefInternal> do not include any project that involves</Text><Paragraph lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513738" lims:id="1513738"><Label>(a)</Label><Text>the placement of temporary or permanent fill in a water body;</Text></Paragraph><Paragraph lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513739" lims:id="1513739"><Label>(b)</Label><Text>the disturbance of known or suspected subsurface contamination, unless the project is located within a site that is classified as closed in the <XRefExternal reference-type="other">Federal Contaminated Sites Inventory</XRefExternal> but not including sites closed that require risk management measures;</Text></Paragraph><Paragraph lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513740" lims:id="1513740"><Label>(c)</Label><Text>the use of vehicles or heavy machinery on the substrate of a water body; or</Text></Paragraph><Paragraph lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513741" lims:id="1513741"><Label>(d)</Label><Text>the use of explosives.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513742" lims:id="1513742"><Label>(2)</Label><Text>The classes of projects described in subsections <XRefInternal>56</XRefInternal>(1) and (2) and <XRefInternal>57</XRefInternal>(1) and (2) do not include any project that involves placing or affixing legs or piles in the substrate or bed of a water body.</Text></Subsection></Section><Section lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:lastAmendedDate="2025-02-28" lims:fid="1513743" lims:id="1513743"><Label>52</Label><Text>This Part applies to any culvert and any structure used for berthing or mooring, any hydrometric station, including any related personnel shelter and any marine navigation aid structure as well as any other physical work.</Text></Section><Heading lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513744" lims:id="1513744" level="2"><TitleText>Culverts and Structures for Berthing or Mooring and Other Physical Works</TitleText></Heading><Section lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:lastAmendedDate="2025-02-28" lims:fid="1513745" lims:id="1513745"><Label>53</Label><Text>The modification or replacement of a culvert that is located alongside or underneath a road, railway, airport pavement or trail, is not located in waters frequented by fish and does not involve activities below the annual high water mark</Text></Section><Section lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:lastAmendedDate="2025-02-28" lims:fid="1513746" lims:id="1513746"><Label>54</Label><Text>The modification, removal or replacement of a structure used for berthing or mooring that has a footprint of no more than 1000 m<Sup>2</Sup></Text></Section><Section lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:lastAmendedDate="2025-02-28" lims:fid="1513747" lims:id="1513747"><Label>55</Label><Text>The modification or replacement of any other physical work that has a footprint of no more than 1000 m<Sup>2</Sup></Text></Section><Heading lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513748" lims:id="1513748" level="2"><TitleText>Hydrometric Stations and Marine Navigation Aid Structures</TitleText></Heading><Section lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:lastAmendedDate="2025-02-28" lims:fid="1513749" lims:id="1513749"><Label>56</Label><Subsection lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513750" lims:id="1513750"><Label>(1)</Label><Text>The construction or installation of a hydrometric station that has a footprint of no more than 100 m<Sup>2</Sup></Text></Subsection><Subsection lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513751" lims:id="1513751"><Label>(2)</Label><Text>The expansion of any hydrometric station referred to in subsection (1), provided that expansion does not increase the total footprint of that hydrometric station to more than the limit set out in that subsection</Text></Subsection><Subsection lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513752" lims:id="1513752"><Label>(3)</Label><Text>The modification, decommissioning, removal or replacement of any hydrometric station that has a footprint of no more than 1000 m<Sup>2</Sup></Text></Subsection></Section><Section lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:lastAmendedDate="2025-02-28" lims:fid="1513753" lims:id="1513753"><Label>57</Label><Subsection lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513754" lims:id="1513754"><Label>(1)</Label><Text>The construction or installation of a marine navigation aid structure that has a footprint of no more than 100 m<Sup>2</Sup></Text></Subsection><Subsection lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513755" lims:id="1513755"><Label>(2)</Label><Text>The expansion of any marine navigation aid structure referred to in subsection (1), provided that expansion does not increase the total footprint of that marine navigation aid structure to more than the limit set out in that subsection</Text></Subsection><Subsection lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513756" lims:id="1513756"><Label>(3)</Label><Text>The modification, decommissioning, removal or replacement of any marine navigation aid structure that has a footprint of no more than 1000 m<Sup>2</Sup></Text></Subsection></Section><Heading lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513757" lims:id="1513757" level="1"><Label>PART 9</Label><TitleText>Other Projects</TitleText></Heading><Heading lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513758" lims:id="1513758" level="2"><TitleText>Interpretation Application</TitleText></Heading><Section lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:lastAmendedDate="2025-02-28" lims:fid="1513759" lims:id="1513759"><Label>58</Label><Text>For the purposes of sections <XRefInternal>63</XRefInternal>, <XRefInternal>66</XRefInternal> and <XRefInternal>67</XRefInternal>, <DefinedTermEn>other physical work</DefinedTermEn> means</Text><Paragraph lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513760" lims:id="1513760"><Label>(a)</Label><Text>a patio;</Text></Paragraph><Paragraph lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513761" lims:id="1513761"><Label>(b)</Label><Text>a flagpole;</Text></Paragraph><Paragraph lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513762" lims:id="1513762"><Label>(c)</Label><Text>a banner;</Text></Paragraph><Paragraph lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513763" lims:id="1513763"><Label>(d)</Label><Text>an interpretive display;</Text></Paragraph><Paragraph lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513764" lims:id="1513764"><Label>(e)</Label><Text>landscaping that involves a structure;</Text></Paragraph><Paragraph lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513765" lims:id="1513765"><Label>(f)</Label><Text>a mail receptacle; and</Text></Paragraph><Paragraph lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513766" lims:id="1513766"><Label>(g)</Label><Text>fixed location furniture.</Text></Paragraph></Section><Section lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:lastAmendedDate="2025-02-28" lims:fid="1513767" lims:id="1513767"><Label>59</Label><Subsection lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513768" lims:id="1513768"><Label>(1)</Label><Text>The classes of projects described in sections <XRefInternal>61</XRefInternal> to <XRefInternal>67</XRefInternal> do not include any project that involves</Text><Paragraph lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513769" lims:id="1513769"><Label>(a)</Label><Text>the placement of temporary or permanent fill in a water body; or</Text></Paragraph><Paragraph lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513770" lims:id="1513770"><Label>(b)</Label><Text>the disturbance of known or suspected subsurface contamination, unless the project is located within a site that is classified as closed in the <XRefExternal reference-type="other">Federal Contaminated Sites Inventory</XRefExternal> but not including sites closed that require risk management measures.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513771" lims:id="1513771"><Label>(2)</Label><Text>The classes of projects described in sections <XRefInternal>61</XRefInternal> and <XRefInternal>64</XRefInternal> do not include any project that results in an antenna that reaches higher than 60 m above the ground.</Text></Subsection></Section><Section lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:lastAmendedDate="2025-02-28" lims:fid="1513772" lims:id="1513772"><Label>60</Label><Text>This Part applies to any radio communication antenna or radar system, including any associated equipment, any scientific instrument, including its housing and enclosure, for the purpose of data collection and any other physical work.</Text></Section><Heading lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513773" lims:id="1513773" level="2"><TitleText>Infrastructure — Developed Land</TitleText></Heading><Section lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:lastAmendedDate="2025-02-28" lims:fid="1513774" lims:id="1513774"><Label>61</Label><Subsection lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513775" lims:id="1513775"><Label>(1)</Label><Text>On developed land, the construction, installation, decommissioning, removal or replacement of a radio communication antenna or radar system that has a footprint of no more than 1000 m<Sup>2</Sup></Text></Subsection><Subsection lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513776" lims:id="1513776"><Label>(2)</Label><Text>On developed land, the expansion of any radio communication antenna or radar system referred to in subsection (1), provided that expansion does not increase the total footprint of that radio communication antenna or radar system to more than the limit set out in that subsection</Text></Subsection></Section><Section lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:lastAmendedDate="2025-02-28" lims:fid="1513777" lims:id="1513777"><Label>62</Label><Subsection lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513778" lims:id="1513778"><Label>(1)</Label><Text>On developed land, the construction, installation, decommissioning, removal or replacement of a scientific instrument that has a footprint of no more than 1000 m<Sup>2</Sup></Text></Subsection><Subsection lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513779" lims:id="1513779"><Label>(2)</Label><Text>On developed land, the expansion of any scientific instrument referred to in subsection (1), provided that expansion does not increase the total footprint of that scientific instrument to more than the limit set out in that subsection</Text></Subsection></Section><Section lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:lastAmendedDate="2025-02-28" lims:fid="1513780" lims:id="1513780"><Label>63</Label><Subsection lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513781" lims:id="1513781"><Label>(1)</Label><Text>On developed land, the construction, installation, decommissioning, removal or replacement of any other physical work that has a footprint of no more than 1000 m<Sup>2</Sup></Text></Subsection><Subsection lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513782" lims:id="1513782"><Label>(2)</Label><Text>On developed land, the expansion of any other physical work, provided that the total footprint of all expansions of that other physical work is no more than 1000 m<Sup>2</Sup></Text></Subsection></Section><Heading lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513783" lims:id="1513783" level="2"><TitleText>Infrastructure — Land That Is Not Developed</TitleText></Heading><Section lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:lastAmendedDate="2025-02-28" lims:fid="1513784" lims:id="1513784"><Label>64</Label><Subsection lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513785" lims:id="1513785"><Label>(1)</Label><Text>On land that is not developed, the construction, installation, decommissioning, removal or replacement of a radio communication antenna or radar system that has a footprint of no more than 100 m<Sup>2</Sup></Text></Subsection><Subsection lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513786" lims:id="1513786"><Label>(2)</Label><Text>On land that is not developed, the expansion of a radio communication antenna or radar system referred to in subsection (1) provided that expansion does not increase the total footprint of that radio communication antenna or radar system to more than the limit set out in that subsection</Text></Subsection></Section><Section lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:lastAmendedDate="2025-02-28" lims:fid="1513787" lims:id="1513787"><Label>65</Label><Subsection lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513788" lims:id="1513788"><Label>(1)</Label><Text>On land that is not developed, the construction, installation, decommissioning, removal or replacement of a scientific instrument that has a footprint of no more than 100 m<Sup>2</Sup></Text></Subsection><Subsection lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513789" lims:id="1513789"><Label>(2)</Label><Text>On land that is not developed, the expansion of any scientific instrument referred to in subsection (1), provided that expansion does not increase the total footprint of that scientific instrument to more than the limit set out in that subsection</Text></Subsection></Section><Section lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:lastAmendedDate="2025-02-28" lims:fid="1513790" lims:id="1513790"><Label>66</Label><Subsection lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513791" lims:id="1513791"><Label>(1)</Label><Text>On land that is not developed, the construction, installation, decommissioning, removal or replacement of any other physical work that has a footprint of no more than 100 m<Sup>2</Sup></Text></Subsection><Subsection lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513792" lims:id="1513792"><Label>(2)</Label><Text>On land that is not developed, the expansion of any other physical work, provided that the total footprint of all expansions of that other physical work is no more than 100 m<Sup>2</Sup></Text></Subsection></Section><Section lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:lastAmendedDate="2025-02-28" lims:fid="1513793" lims:id="1513793"><Label>67</Label><Text>The modification of any radio communication antenna or radar system, scientific instrument or other physical work</Text></Section></RegulationPiece></Schedule><Schedule lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:lastAmendedDate="2025-02-28" lims:fid="1513794" lims:id="1513794"><ScheduleFormHeading lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513795" lims:id="1513795"><Label>SCHEDULE 2</Label><OriginatingRef>(Subsection 3(2) and section 4)</OriginatingRef><TitleText>Classes of Projects on Federal Lands Administered by Parks Canada Agency</TitleText></ScheduleFormHeading><RegulationPiece lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513796" lims:id="1513796"><Heading lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513797" lims:id="1513797" level="1"><TitleText>Interpretation</TitleText></Heading><Section lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:lastAmendedDate="2025-02-28" lims:fid="1513798" lims:id="1513798"><Label>1</Label><Text>The following definitions apply in this Schedule.</Text><Definition lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513799" lims:id="1513799"><Text><DefinedTermEn>boathouse</DefinedTermEn> means a structure, with or without walls, that is designed to shelter and store a boat. (<DefinedTermFr>remise à bateau</DefinedTermFr>)</Text></Definition><Definition lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513800" lims:id="1513800"><Text><DefinedTermEn>management plan</DefinedTermEn> means, in respect of a national park, the management plan for that land that is tabled in each House of Parliament under subsection 32(1) of the <XRefExternal reference-type="act" link="P-0.4">Parks Canada Agency Act</XRefExternal>, subsection 11(1) of the <XRefExternal reference-type="act" link="N-14.01">Canada National Parks Act</XRefExternal> or subsection 9(1) of the <XRefExternal reference-type="act" link="R-8.55">Rouge National Urban Park Act</XRefExternal>. (<DefinedTermFr>plan directeur</DefinedTermFr>)</Text></Definition><Definition lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513801" lims:id="1513801"><Text><DefinedTermEn>national park</DefinedTermEn> includes a <DefinitionRef>park</DefinitionRef> and <DefinitionRef>park reserve</DefinitionRef> as those terms are defined in subsection 2(1) of the <XRefExternal reference-type="act" link="N-14.01">Canada National Parks Act</XRefExternal>. (<DefinedTermFr>parc national</DefinedTermFr>)</Text></Definition></Section><Heading lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513802" lims:id="1513802" level="1"><Label>PART 1</Label><TitleText>Non-specific Classes</TitleText></Heading><Section lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:lastAmendedDate="2025-02-28" lims:fid="1513803" lims:id="1513803"><Label>2</Label><Text>The operation or maintenance of any physical work, whether or not the physical work is referred to in this Schedule</Text></Section><Section lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:lastAmendedDate="2025-02-28" lims:fid="1513804" lims:id="1513804"><Label>3</Label><Text>Any physical activity that is carried out entirely within the interior of a building</Text></Section><Section lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:lastAmendedDate="2025-02-28" lims:fid="1513805" lims:id="1513805"><Label>4</Label><Text>The modification or repair of any roadway, highway or parkway or of any related infrastructure</Text></Section><Section lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:lastAmendedDate="2025-02-28" lims:fid="1513806" lims:id="1513806"><Label>5</Label><Text>The installation, modification, repair, decommissioning, removal or replacement of any prefabricated structure</Text></Section><Section lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:lastAmendedDate="2025-02-28" lims:fid="1513807" lims:id="1513807"><Label>6</Label><Text>The construction, installation, expansion, modification, repair, decommissioning, removal or replacement of any rudimentary campsite located within an existing rudimentary campground that does not involve the construction of a new toilet system or the use of heavy equipment</Text></Section><Section lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:lastAmendedDate="2025-02-28" lims:fid="1513808" lims:id="1513808"><Label>7</Label><Text>The construction, installation, expansion, modification, repair, decommissioning, removal or replacement of any tent pad or movable accommodation at a campground that does not involve</Text><Paragraph lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513809" lims:id="1513809"><Label>(a)</Label><Text>the installation or modification of a waste water system; or</Text></Paragraph><Paragraph lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513810" lims:id="1513810"><Label>(b)</Label><Text>the removal of vegetation with heavy equipment</Text></Paragraph></Section><Section lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:lastAmendedDate="2025-02-28" lims:fid="1513811" lims:id="1513811"><Label>8</Label><Subsection lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513812" lims:id="1513812"><Label>(1)</Label><Text>The construction of any well used to conduct geotechnical, environmental or scientific investigations but not including any project that involves the placement of temporary or permanent fill in a water body</Text></Subsection><Subsection lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513813" lims:id="1513813"><Label>(2)</Label><Text>The decommissioning of any well referred to in subsection (1)</Text></Subsection></Section><Section lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:lastAmendedDate="2025-02-28" lims:fid="1513814" lims:id="1513814"><Label>9</Label><Text>The repair of any overhead or underground electrical transmission or distribution line or related infrastructure</Text></Section><Section lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:lastAmendedDate="2025-02-28" lims:fid="1513815" lims:id="1513815"><Label>10</Label><Text>The repair of an overhead or underground telecommunication line or related infrastructure</Text></Section><Section lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:lastAmendedDate="2025-02-28" lims:fid="1513816" lims:id="1513816"><Label>11</Label><Text>The expansion, modification, repair, decommissioning, removal or replacement of any trail that does not involve</Text><Paragraph lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513817" lims:id="1513817"><Label>(a)</Label><Text>the installation of a new pedestrian bridge on an existing trail;</Text></Paragraph><Paragraph lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513818" lims:id="1513818"><Label>(b)</Label><Text>the paving of any unpaved portion of the trail;</Text></Paragraph><Paragraph lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513819" lims:id="1513819"><Label>(c)</Label><Text>the removal of vegetation with heavy equipment;</Text></Paragraph><Paragraph lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513820" lims:id="1513820"><Label>(d)</Label><Text>the widening of the trail by more than 50 cm on either side;</Text></Paragraph><Paragraph lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513821" lims:id="1513821"><Label>(e)</Label><Text>the extension of the trail’s length by more than 500 m; or</Text></Paragraph><Paragraph lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513822" lims:id="1513822"><Label>(f)</Label><Text>the rerouting of the trail such that its route is more than 50 m from its former route or its length is extended by more than 500 m</Text></Paragraph></Section><Section lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:lastAmendedDate="2025-02-28" lims:fid="1513823" lims:id="1513823"><Label>12</Label><Text>The modification, removal or replacement of any above ground petroleum storage tank system for petroleum products or allied petroleum products that does not involve the removal of vegetation with heavy equipment</Text></Section><Section lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:lastAmendedDate="2025-02-28" lims:fid="1513824" lims:id="1513824"><Label>13</Label><Text>The modification, repair, decommissioning or removal of any shoreline stabilization work, wharf, pier, dock, boathouse, launch ramp or navigational aid that does not involve</Text><Paragraph lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513825" lims:id="1513825"><Label>(a)</Label><Text>the placement of temporary or permanent fill in a water body;</Text></Paragraph><Paragraph lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513826" lims:id="1513826"><Label>(b)</Label><Text>dredging; or</Text></Paragraph><Paragraph lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513827" lims:id="1513827"><Label>(c)</Label><Text>the construction of a permanent diversion channel</Text></Paragraph></Section><Section lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:lastAmendedDate="2025-02-28" lims:fid="1513828" lims:id="1513828"><Label>14</Label><Text>The modification or repair of any causeway, fishway, fish ladder, retaining wall or breakwater that does not involve</Text><Paragraph lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513829" lims:id="1513829"><Label>(a)</Label><Text>the placement of temporary or permanent fill in a water body;</Text></Paragraph><Paragraph lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513830" lims:id="1513830"><Label>(b)</Label><Text>dredging; or</Text></Paragraph><Paragraph lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513831" lims:id="1513831"><Label>(c)</Label><Text>the construction of a permanent diversion channel</Text></Paragraph></Section><Section lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:lastAmendedDate="2025-02-28" lims:fid="1513832" lims:id="1513832"><Label>15</Label><Text>The modification or repair of any wastewater treatment system that has a footprint of no more than 1000 m<Sup>2</Sup></Text></Section><Heading lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513833" lims:id="1513833" level="1"><Label>PART 2</Label><TitleText>Historic Canals and National Marine Conservation Areas</TitleText></Heading><Heading lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513834" lims:id="1513834" level="2"><TitleText>Interpretation Application</TitleText></Heading><Section lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:lastAmendedDate="2025-02-28" lims:fid="1513835" lims:id="1513835"><Label>16</Label><Text>In this Part <DefinedTermEn>national marine conservation area</DefinedTermEn> includes a <DefinitionRef>marine conservation area</DefinitionRef> and <DefinitionRef>reserve</DefinitionRef> as those terms are defined in subsection 2(1) of the <XRefExternal reference-type="act" link="C-7.3">Canada National Marine Conservation Areas Act</XRefExternal>. </Text></Section><Section lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:lastAmendedDate="2025-02-28" lims:fid="1513836" lims:id="1513836"><Label>17</Label><Text>The classes of projects described in sections <XRefInternal>19</XRefInternal> to <XRefInternal>21</XRefInternal> do not include any project that involves</Text><Paragraph lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513837" lims:id="1513837"><Label>(a)</Label><Text>dredging;</Text></Paragraph><Paragraph lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513838" lims:id="1513838"><Label>(b)</Label><Text>the construction of a permanent diversion channel; or</Text></Paragraph><Paragraph lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513839" lims:id="1513839"><Label>(c)</Label><Text>the permanent increase of the footprint of a physical work below the high-water mark.</Text></Paragraph></Section><Section lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:lastAmendedDate="2025-02-28" lims:fid="1513840" lims:id="1513840"><Label>18</Label><Text>This Part applies to any physical work that is carried out within a <DefinitionRef>historic canal</DefinitionRef> as defined in section 2 of the <XRefExternal reference-type="regulation" link="SOR-93-220">Historic Canals Regulations</XRefExternal> or national marine conservation area.</Text></Section><Heading lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513841" lims:id="1513841" level="2"><TitleText>Physical Works — Historic Canals and National Marine Conservation Areas</TitleText></Heading><Section lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:lastAmendedDate="2025-02-28" lims:fid="1513842" lims:id="1513842"><Label>19</Label><Text>The modification or repair of any lock, dam or bridge</Text></Section><Section lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:lastAmendedDate="2025-02-28" lims:fid="1513843" lims:id="1513843"><Label>20</Label><Text>The installation, modification, repair, decommissioning, removal or replacement of any in-water anchoring system, hook-up, boat lift, marine railway, inland boat slip or mooring basin</Text></Section><Section lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:lastAmendedDate="2025-02-28" lims:fid="1513844" lims:id="1513844"><Label>21</Label><Text>The installation, modification, repair, removal, decommissioning or replacement of any shoreline stabilization work, wharf, pier, dock, boathouse, launch ramp or navigational aid</Text></Section><Heading lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513845" lims:id="1513845" level="1"><Label>PART 3</Label><TitleText>National Parks, National Urban Parks and National Historic Sites</TitleText></Heading><Heading lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513846" lims:id="1513846" level="2"><TitleText>Application</TitleText></Heading><Section lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:lastAmendedDate="2025-02-28" lims:fid="1513847" lims:id="1513847"><Label>22</Label><Text>The classes of projects described in sections <XRefInternal>24</XRefInternal> to <XRefInternal>34</XRefInternal> do not include any project that involves</Text><Paragraph lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513848" lims:id="1513848"><Label>(a)</Label><Text>the placement of temporary or permanent fill in a water body;</Text></Paragraph><Paragraph lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513849" lims:id="1513849"><Label>(b)</Label><Text>the installation or modification of a wastewater treatment system; or</Text></Paragraph><Paragraph lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513850" lims:id="1513850"><Label>(c)</Label><Text>the removal of vegetation with heavy equipment.</Text></Paragraph></Section><Section lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:lastAmendedDate="2025-02-28" lims:fid="1513851" lims:id="1513851"><Label>23</Label><Subsection lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513852" lims:id="1513852"><Label>(1)</Label><Text>Subject to subsection (2), this Part applies to any physical work that is carried out on developed land that is accessible by road within a <DefinitionRef>national historic site</DefinitionRef> — which means a place that is commemorated under section 3 of the <XRefExternal reference-type="act" link="H-4">Historic Sites and Monuments Act</XRefExternal> and is administered by the Parks Canada Agency — national urban park, national park without zoning or an area of a national park that is zoned Zone IV or Zone V in accordance with the management plan.</Text></Subsection><Subsection lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513853" lims:id="1513853"><Label>(2)</Label><Text>Any project that is carried out on developed land in the Town of Banff that is zoned Zone V in accordance with the management plan is subject to sections <XRefInternal>30</XRefInternal> to <XRefInternal>34</XRefInternal>.</Text></Subsection></Section><Heading lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513854" lims:id="1513854" level="2"><TitleText>Physical Works — Developed Land</TitleText></Heading><Section lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:lastAmendedDate="2025-02-28" lims:fid="1513855" lims:id="1513855"><Label>24</Label><Text>The installation, modification, repair, decommissioning, removal or replacement of any building or other structure</Text></Section><Section lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:lastAmendedDate="2025-02-28" lims:fid="1513856" lims:id="1513856"><Label>25</Label><Text>The modification, repair, decommissioning, removal or replacement of any campsite</Text></Section><Section lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:lastAmendedDate="2025-02-28" lims:fid="1513857" lims:id="1513857"><Label>26</Label><Text>The construction, installation, expansion, modification, repair, decommissioning, removal or replacement of any hook-up</Text></Section><Section lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:lastAmendedDate="2025-02-28" lims:fid="1513858" lims:id="1513858"><Label>27</Label><Text>The construction, installation, expansion, modification, repair, decommissioning, removal or replacement of any sidewalk, boardwalk, fence or railing</Text></Section><Section lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:lastAmendedDate="2025-02-28" lims:fid="1513859" lims:id="1513859"><Label>28</Label><Text>The decommissioning of any road, parking lot or pull-off</Text></Section><Section lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:lastAmendedDate="2025-02-28" lims:fid="1513860" lims:id="1513860"><Label>29</Label><Text>The construction of any building or other structure in a <DefinitionRef>park community</DefinitionRef>, as defined in subsection 2(1) of the <XRefExternal reference-type="act" link="N-14.01">Canada National Parks Act</XRefExternal></Text></Section><Heading lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513861" lims:id="1513861" level="2"><TitleText>Physical Works – Developed Land Within the Town of Banff</TitleText></Heading><Section lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:lastAmendedDate="2025-02-28" lims:fid="1513862" lims:id="1513862"><Label>30</Label><Text>The modification, repair, decommissioning or removal of any building or other structure located within the Town of Banff</Text></Section><Section lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:lastAmendedDate="2025-02-28" lims:fid="1513863" lims:id="1513863"><Label>31</Label><Text>The repair, decommissioning or removal of any hook-up located within the Town of Banff</Text></Section><Section lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:lastAmendedDate="2025-02-28" lims:fid="1513864" lims:id="1513864"><Label>32</Label><Text>The repair, decommissioning or removal of any sidewalk, boardwalk, fence or railing located within the Town of Banff</Text></Section><Section lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:lastAmendedDate="2025-02-28" lims:fid="1513865" lims:id="1513865"><Label>33</Label><Text>The decommissioning of any road, parking lot or pull-off located within the Town of Banff</Text></Section><Section lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:lastAmendedDate="2025-02-28" lims:fid="1513866" lims:id="1513866"><Label>34</Label><Text>The modification, repair, decommissioning or removal of any recreational ground located within the Town of Banff</Text></Section></RegulationPiece></Schedule><Schedule lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:lastAmendedDate="2025-02-28" lims:fid="1513867" lims:id="1513867"><ScheduleFormHeading lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513868" lims:id="1513868"><Label>SCHEDULE 3</Label><OriginatingRef>(Subsection 3(3) and section 4)</OriginatingRef><TitleText>Classes of Projects Within an Area Referred to in Schedule I of the <XRefExternal reference-type="regulation" link="C.R.C.,_c._1609">Wildlife Area Regulations</XRefExternal></TitleText></ScheduleFormHeading><RegulationPiece lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513869" lims:id="1513869"><Heading lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513870" lims:id="1513870" level="1"><Label>PART 1</Label><TitleText>Non-specific Classes</TitleText></Heading><Section lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:lastAmendedDate="2025-02-28" lims:fid="1513871" lims:id="1513871"><Label>1</Label><Text>The operation, maintenance or repair of any physical work, including overhead or underground electrical transmission or distribution lines, whether or not the physical work is referred to in this Schedule</Text></Section><Section lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:lastAmendedDate="2025-02-28" lims:fid="1513872" lims:id="1513872"><Label>2</Label><Text>Any physical activity that is carried out entirely within the interior of a building</Text></Section><Section lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:lastAmendedDate="2025-02-28" lims:fid="1513873" lims:id="1513873"><Label>3</Label><Subsection lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513874" lims:id="1513874"><Label>(1)</Label><Text>The construction of any well used to conduct geotechnical, environmental or scientific investigations but not including any project that involves the placement of temporary or permanent fill in a water body</Text></Subsection><Subsection lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513875" lims:id="1513875"><Label>(2)</Label><Text>The decommissioning of any well referred to in subsection (1)</Text></Subsection></Section><Heading lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513876" lims:id="1513876" level="1"><Label>PART 2</Label><TitleText>Building Classes</TitleText></Heading><Heading lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513877" lims:id="1513877" level="2"><TitleText>Application</TitleText></Heading><Section lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:lastAmendedDate="2025-02-28" lims:fid="1513878" lims:id="1513878"><Label>4</Label><Text>The classes of projects described in sections <XRefInternal>6</XRefInternal> to <XRefInternal>9</XRefInternal> do not include any project that involves</Text><Paragraph lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513879" lims:id="1513879"><Label>(a)</Label><Text>the placement of temporary or permanent fill in a water body;</Text></Paragraph><Paragraph lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513880" lims:id="1513880"><Label>(b)</Label><Text>the disturbance of known or suspected subsurface contamination, unless the project is located within a site that is classified as closed in the <XRefExternal reference-type="other">Federal Contaminated Sites Inventory</XRefExternal> but not including sites closed that require risk management measures; or</Text></Paragraph><Paragraph lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513881" lims:id="1513881"><Label>(c)</Label><Text>demolition that is to be carried out less than 30 m from a building.</Text></Paragraph></Section><Section lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:lastAmendedDate="2025-02-28" lims:fid="1513882" lims:id="1513882"><Label>5</Label><Text>This Part applies to any building located within an area referred to in Schedule I of the <XRefExternal reference-type="regulation" link="C.R.C.,_c._1609">Wildlife Area Regulations</XRefExternal>.</Text></Section><Heading lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513883" lims:id="1513883" level="2"><TitleText>Physical Works — Developed Land</TitleText></Heading><Section lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:lastAmendedDate="2025-02-28" lims:fid="1513884" lims:id="1513884"><Label>6</Label><Text>On developed land, the construction, installation, decommissioning, removal, replacement, moving or demolition of any building that has a footprint of no more than 1000 m<Sup>2</Sup></Text></Section><Section lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:lastAmendedDate="2025-02-28" lims:fid="1513885" lims:id="1513885"><Label>7</Label><Text>On developed land, the expansion of any building, provided that the total footprint of all expansions of that physical work is no more than 1000 m<Sup>2</Sup></Text></Section><Heading lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513886" lims:id="1513886" level="2"><TitleText>Physical Works — Land That Is Not Developed</TitleText></Heading><Section lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:lastAmendedDate="2025-02-28" lims:fid="1513887" lims:id="1513887"><Label>8</Label><Subsection lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513888" lims:id="1513888"><Label>(1)</Label><Text>On land that is not developed, the construction or installation of any building that has a footprint of no more than 100 m<Sup>2</Sup></Text></Subsection><Subsection lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513889" lims:id="1513889"><Label>(2)</Label><Text>On land that is not developed, the expansion of any building, provided that the total footprint of all expansions of that physical work is no more than 100 m<Sup>2</Sup></Text></Subsection><Subsection lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513890" lims:id="1513890"><Label>(3)</Label><Text>On land that is not developed, the decommissioning, removal, replacement or moving of any physical work referred to in subsection (1), if the footprint is no more than 100 m<Sup>2</Sup></Text></Subsection></Section><Section lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:lastAmendedDate="2025-02-28" lims:fid="1513891" lims:id="1513891"><Label>9</Label><Text>The modification of any building</Text></Section><Heading lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513892" lims:id="1513892" level="1"><Label>PART 3</Label><TitleText>Other Physical Works</TitleText></Heading><Heading lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513893" lims:id="1513893" level="2"><TitleText>Interpretation and Application</TitleText></Heading><Section lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:lastAmendedDate="2025-02-28" lims:fid="1513894" lims:id="1513894"><Label>10</Label><Text>In this Part, <DefinedTermEn>other physical work</DefinedTermEn> means</Text><Paragraph lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513895" lims:id="1513895"><Label>(a)</Label><Text>a parking lot;</Text></Paragraph><Paragraph lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513896" lims:id="1513896"><Label>(b)</Label><Text>a paved area; and</Text></Paragraph><Paragraph lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513897" lims:id="1513897"><Label>(c)</Label><Text>a gravel or stone dust area.</Text></Paragraph></Section><Section lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:lastAmendedDate="2025-02-28" lims:fid="1513898" lims:id="1513898"><Label>11</Label><Text>The classes of projects described in sections <XRefInternal>13</XRefInternal> and <XRefInternal>14</XRefInternal> do not include any project that involves</Text><Paragraph lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513899" lims:id="1513899"><Label>(a)</Label><Text>the placement of temporary or permanent fill in a water body; or</Text></Paragraph><Paragraph lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513900" lims:id="1513900"><Label>(b)</Label><Text>the disturbance of known or suspected subsurface contamination, unless the project is located within a site that is classified as closed in the <XRefExternal reference-type="other">Federal Contaminated Sites Inventory</XRefExternal> but not including sites closed that require risk management measures.</Text></Paragraph></Section><Section lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:lastAmendedDate="2025-02-28" lims:fid="1513901" lims:id="1513901"><Label>12</Label><Text>This Part applies to any other physical work.</Text></Section><Heading lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513902" lims:id="1513902" level="2"><TitleText>Physical Works — Developed Land</TitleText></Heading><Section lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:lastAmendedDate="2025-02-28" lims:fid="1513903" lims:id="1513903"><Label>13</Label><Text>On developed land, the decommissioning, removal or replacement of any other physical work that has a footprint of no more than 1000 m<Sup>2</Sup></Text></Section><Heading lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513904" lims:id="1513904" level="2"><TitleText>Physical Works — Land that is not Developed</TitleText></Heading><Section lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:lastAmendedDate="2025-02-28" lims:fid="1513905" lims:id="1513905"><Label>14</Label><Text>On land that is not developed, the decommissioning, removal or replacement of any other physical work that has a footprint of no more than 100 m<Sup>2</Sup></Text></Section><Heading lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513906" lims:id="1513906" level="1"><Label>PART 4</Label><TitleText>Utility Infrastructure</TitleText></Heading><Heading lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513907" lims:id="1513907" level="2"><TitleText>Application</TitleText></Heading><Section lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:lastAmendedDate="2025-02-28" lims:fid="1513908" lims:id="1513908"><Label>15</Label><Subsection lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513909" lims:id="1513909"><Label>(1)</Label><Text>The classes of projects described in sections <XRefInternal>17</XRefInternal> to <XRefInternal>19</XRefInternal> do not include any project that involves</Text><Paragraph lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513910" lims:id="1513910"><Label>(a)</Label><Text>the placement of temporary or permanent fill in a water body; or</Text></Paragraph><Paragraph lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513911" lims:id="1513911"><Label>(b)</Label><Text>the disturbance of known or suspected subsurface contamination, unless the project is located within a site that is classified as closed in the <XRefExternal reference-type="other">Federal Contaminated Sites Inventory</XRefExternal> but not including sites closed that require risk management measures.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513912" lims:id="1513912"><Label>(2)</Label><Text>The classes of projects described in section <XRefInternal>17</XRefInternal> do not include any project that involves the use of</Text><Paragraph lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513913" lims:id="1513913"><Label>(a)</Label><Text>vehicles or heavy machinery on the substrate of a water body; or</Text></Paragraph><Paragraph lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513914" lims:id="1513914"><Label>(b)</Label><Text>explosives.</Text></Paragraph></Subsection></Section><Section lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:lastAmendedDate="2025-02-28" lims:fid="1513915" lims:id="1513915"><Label>16</Label><Text>This Part applies to any water-related utility infrastructure, other than a water pipeline or water treatment facility, as well as any water pipeline.</Text></Section><Heading lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513916" lims:id="1513916" level="2"><TitleText>Water-related Utility Infrastructure</TitleText></Heading><Section lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:lastAmendedDate="2025-02-28" lims:fid="1513917" lims:id="1513917"><Label>17</Label><Text>The decommissioning, removal or replacement of any water-related utility infrastructure that has a footprint of no more than 1000 m<Sup>2</Sup></Text></Section><Heading lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513918" lims:id="1513918" level="2"><TitleText>Water Pipelines</TitleText></Heading><Section lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:lastAmendedDate="2025-02-28" lims:fid="1513919" lims:id="1513919"><Label>18</Label><Text>The decommissioning, removal or replacement of any water pipeline that is no more than 1000 m in length</Text></Section><Section lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:lastAmendedDate="2025-02-28" lims:fid="1513920" lims:id="1513920"><Label>19</Label><Text>The decommissioning, removal or replacement of any water pipeline, of any length, that is located</Text><Paragraph lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513921" lims:id="1513921"><Label>(a)</Label><Text>underneath a railway, a road or airport pavement;</Text></Paragraph><Paragraph lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513922" lims:id="1513922"><Label>(b)</Label><Text>alongside and contiguous to the infrastructure referred to in paragraph (a), if on developed land; or</Text></Paragraph><Paragraph lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513923" lims:id="1513923"><Label>(c)</Label><Text>within the right of way of a telecommunication or electrical line</Text></Paragraph></Section><Heading lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513924" lims:id="1513924" level="1"><Label>PART 5</Label><TitleText>Linear Infrastructures</TitleText></Heading><Heading lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513925" lims:id="1513925" level="2"><TitleText>Interpretation and Application</TitleText></Heading><Section lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:lastAmendedDate="2025-02-28" lims:fid="1513926" lims:id="1513926"><Label>20</Label><Text>In this Part, <DefinedTermEn>linear infrastructure</DefinedTermEn> means</Text><Paragraph lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513927" lims:id="1513927"><Label>(a)</Label><Text>a road; and</Text></Paragraph><Paragraph lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513928" lims:id="1513928"><Label>(b)</Label><Text>a guardrail, handrail, curb, fence or gate.</Text></Paragraph></Section><Section lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:lastAmendedDate="2025-02-28" lims:fid="1513929" lims:id="1513929"><Label>21</Label><Text>The classes of projects described in sections <XRefInternal>23</XRefInternal> and <XRefInternal>24</XRefInternal> do not include any project that involves</Text><Paragraph lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513930" lims:id="1513930"><Label>(a)</Label><Text>the placement of temporary or permanent fill in a water body; or</Text></Paragraph><Paragraph lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513931" lims:id="1513931"><Label>(b)</Label><Text>the disturbance of known or suspected subsurface contamination, unless the project is located within a site that is classified as closed in the <XRefExternal reference-type="other">Federal Contaminated Sites Inventory</XRefExternal> but not including sites closed that require risk management measures.</Text></Paragraph></Section><Section lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:lastAmendedDate="2025-02-28" lims:fid="1513932" lims:id="1513932"><Label>22</Label><Text>This Part applies to any linear infrastructure.</Text></Section><Heading lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513933" lims:id="1513933" level="2"><TitleText>Linear Infrastructures</TitleText></Heading><Section lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:lastAmendedDate="2025-02-28" lims:fid="1513934" lims:id="1513934"><Label>23</Label><Text>The decommissioning, removal or replacement of any linear infrastructure referred to in paragraph <XRefInternal>20</XRefInternal>(a) that is no more than 100 m in length</Text></Section><Section lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:lastAmendedDate="2025-02-28" lims:fid="1513935" lims:id="1513935"><Label>24</Label><Subsection lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513936" lims:id="1513936"><Label>(1)</Label><Text>The construction or installation of any linear infrastructure referred to in paragraph <XRefInternal>20</XRefInternal>(b) that is related to a building or other structure and that is no more than 100 m in length</Text></Subsection><Subsection lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513937" lims:id="1513937"><Label>(2)</Label><Text>The lengthening of any linear infrastructure referred to in paragraph <XRefInternal>20</XRefInternal>(b), if the lengthening is no more than 100 m in length</Text></Subsection><Subsection lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513938" lims:id="1513938"><Label>(3)</Label><Text>The modification, decommissioning, removal or replacement of any linear infrastructure referred to in paragraph <XRefInternal>20</XRefInternal>(b)</Text></Subsection></Section><Heading lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513939" lims:id="1513939" level="1"><Label>PART 6</Label><TitleText>Mobility Projects</TitleText></Heading><Heading lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513940" lims:id="1513940" level="2"><TitleText>Application</TitleText></Heading><Section lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:lastAmendedDate="2025-02-28" lims:fid="1513941" lims:id="1513941"><Label>25</Label><Text>The classes of projects described in sections <XRefInternal>27</XRefInternal> to <XRefInternal>29</XRefInternal> do not include any project that involves</Text><Paragraph lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513942" lims:id="1513942"><Label>(a)</Label><Text>the placement of temporary or permanent fill in a water body; or</Text></Paragraph><Paragraph lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513943" lims:id="1513943"><Label>(b)</Label><Text>the disturbance of known or suspected subsurface contamination, unless the project is located within a site that is classified as closed in the <XRefExternal reference-type="other">Federal Contaminated Sites Inventory</XRefExternal> but not including sites closed that require risk management measures.</Text></Paragraph></Section><Section lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:lastAmendedDate="2025-02-28" lims:fid="1513944" lims:id="1513944"><Label>26</Label><Text>This part applies to any sidewalk, boardwalk, path or trail.</Text></Section><Heading lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513945" lims:id="1513945" level="2"><TitleText>Mobility — Developed Land</TitleText></Heading><Section lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:lastAmendedDate="2025-02-28" lims:fid="1513946" lims:id="1513946"><Label>27</Label><Subsection lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513947" lims:id="1513947"><Label>(1)</Label><Text>On developed land, the construction or installation of any sidewalk, boardwalk, path or trail that is related to a building or other structure and that has a footprint of no more than 1000 m<Sup>2</Sup></Text></Subsection><Subsection lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513948" lims:id="1513948"><Label>(2)</Label><Text>On developed land, the expansion of any sidewalk, boardwalk, path or trail that is related to a building or other structure, provided that the total footprint of all expansions of that physical work is no more than 1000 m<Sup>2</Sup></Text></Subsection><Subsection lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513949" lims:id="1513949"><Label>(3)</Label><Text>On developed land, the decommissioning, removal or replacement of any sidewalk, boardwalk, path or trail that has a footprint of no more than 1000 m<Sup>2</Sup></Text></Subsection></Section><Heading lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513950" lims:id="1513950" level="2"><TitleText>Mobility — Land That Is Not Developed</TitleText></Heading><Section lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:lastAmendedDate="2025-02-28" lims:fid="1513951" lims:id="1513951"><Label>28</Label><Subsection lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513952" lims:id="1513952"><Label>(1)</Label><Text>On land that is not developed, the construction or installation of any sidewalk, boardwalk, path or trail that is related to a building or other structure and that has a footprint of no more than 100 m<Sup>2</Sup></Text></Subsection><Subsection lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513953" lims:id="1513953"><Label>(2)</Label><Text>On land that is not developed, the expansion of any sidewalk, boardwalk, path or trail that is related to a building or other structure, provided that the total footprint of all expansions of that physical work is no more than 100 m<Sup>2</Sup></Text></Subsection><Subsection lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513954" lims:id="1513954"><Label>(3)</Label><Text>On land that is not developed, the decommissioning, removal or replacement of any sidewalk, boardwalk, path or trail that has a footprint of no more than 100 m<Sup>2</Sup></Text></Subsection></Section><Section lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:lastAmendedDate="2025-02-28" lims:fid="1513955" lims:id="1513955"><Label>29</Label><Text>The modification of any sidewalk, boardwalk, path or trail</Text></Section><Heading lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513956" lims:id="1513956" level="1"><Label>PART 7</Label><TitleText>Structures in or Near Water</TitleText></Heading><Section lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:lastAmendedDate="2025-02-28" lims:fid="1513957" lims:id="1513957"><Label>30</Label><Text>The modification or removal of any marine navigation aid structure or structure used for berthing or mooring that has a footprint of no more than 1000 m<Sup>2</Sup> but not including any project that involves</Text><Paragraph lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513958" lims:id="1513958"><Label>(a)</Label><Text>the placement of temporary or permanent fill in a water body;</Text></Paragraph><Paragraph lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513959" lims:id="1513959"><Label>(b)</Label><Text>the disturbance of known or suspected subsurface contamination, unless the project is located within a site that is classified as closed in the <XRefExternal reference-type="other">Federal Contaminated Sites Inventory</XRefExternal> but not including sites closed that require risk management measures;</Text></Paragraph><Paragraph lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513960" lims:id="1513960"><Label>(c)</Label><Text>the use of vehicles or heavy machinery on the substrate of a water body; or</Text></Paragraph><Paragraph lims:inforce-start-date="2025-02-28" lims:enacted-date="2025-02-28" lims:fid="1513961" lims:id="1513961"><Label>(d)</Label><Text>the use of explosives</Text></Paragraph></Section></RegulationPiece></Schedule></Regulation>